Legislative Assembly Petition: #202510
|
closes 1 July 2025
boroondarabug@gmail.com started this petition
Issue:
This petition of residents in Victoria draws to the attention of the Legislative Assembly a proposal for a safe and convenient for the crossing of the Anniversary Trail over Toorak Road in Hartwell - a Strategic Cycling Corridor and long-standing concern to trail users. In early 2015 Boroondara Council (Council) conducted a feasibility study and public engagement in relation to this matter, the outcome of which was confirmation that the preferred solution was the construction of a bridge. In 2018 Council submitted a concept design for the bridge to the Victorian Government requesting funding for the design and construction. In late 2022, the Victorian Government conducted additional public engagement on solutions for the Anniversary Trail connection over Toorak Road but ignored community feedback that favoured the construction of a bridge. In December 2024, Active Transport Victoria advised that while the option preferred by surveyed respondents was for the walking and cycling bridge, they are proceeding with a route that largely replicates problems with the current route.
Action:
The petitioners therefore request that the Legislative Assembly call on the Victorian Government to proceed with the design and construction of the community-preferred solution. Namely, for a bridge over Toorak Road for the Anniversary Trail, meeting accessibility and path design standards, including safety improvements to the existing rail crossing to the north.
This petition of residents in Victoria draws to the attention of the Legislative Assembly a proposal for a safe and convenient for the crossing of the Anniversary Trail over Toorak Road in Hartwell - a Strategic Cycling Corridor and long-standing concern to trail users. In early 2015 Boroondara Council (Council) conducted a feasibility study and public engagement in relation to this matter, the outcome of which was confirmation that the preferred solution was the construction of a bridge. In 2018 Council submitted a concept design for the bridge to the Victorian Government requesting funding for the design and construction. In late 2022, the Victorian Government conducted additional public engagement on solutions for the Anniversary Trail connection over Toorak Road but ignored community feedback that favoured the construction of a bridge. In December 2024, Active Transport Victoria advised that while the option preferred by surveyed respondents was for the walking and cycling bridge, they are proceeding with a route that largely replicates problems with the current route.
Action:
The petitioners therefore request that the Legislative Assembly call on the Victorian Government to proceed with the design and construction of the community-preferred solution. Namely, for a bridge over Toorak Road for the Anniversary Trail, meeting accessibility and path design standards, including safety improvements to the existing rail crossing to the north.
2 signatures
This petition is sponsored by John Pesutto
Sign this petition
More links
Speak up and be heard
Create change and stand up for your beliefs by starting your own petition today
More petitions
Take a look at some other petitions related to causes you care about. There are many passionate individuals just like you who are working towards positive change. Signing more petitions and sharing them with your friends and family can help bring attention to important issues and create lasting impact.
View all petitionsClosure of fisheries stations in Metro Melbourne
Legislative Assembly Petition #202509 | closes 19 September 2025
info@abalonecouncilvictoria.com.au
15,724 signaturesStop creation of Wombat-Lerderderg and Mount Buangor National Parks
Legislative Council Petition #599 | closes 25 May 2025
11,382 signaturesColorectal and Pelvic Reconstruction Service at The Royal Children's Hospital
Legislative Council Petition #627 | closes 16 August 2025
7,490 signatures